Fuel Measurement and Sampling, learned properly and evidenced.

A guided walkthrough of the FMS questionnaire, five scenarios drawn from live biomethane sites, and a marked competency quiz. Results are saved against each person, so you can show who is signed off and where the gaps are.

01

Learn the sections

Sections A to I explained: what each one is for, what Ofgem is looking for, the mistakes that get packs returned, and a worked example from a real site.

02

Run a site scenario

Work a request from the plant: classify consignments, route Section C, decide whether land criteria applies, handle a meter change and a heat deduction.

03

Prove competency

A curated 30-question assessment across every section. Marked server-side, 80% to pass, with a per-section breakdown and a printable record.

Built on five live FMS packs

Every scenario, example and quiz answer traces back to the submitted questionnaires for these installations.

RHI0000024078

Hemswell Biomethane

A food-waste fed AD plant injecting biomethane to grid, with propane enrichment. Six waste consignments, all unmixed before the digester.

RHI0000024090

Barnes Farm

Liquid food waste and wash water delivered by road tanker, plus digestate. Heat meters on the digesters are declared in Section I.

RHI0000024245

Local Generation Biomethane

Food-waste AD plant whose fiscal flow meter was replaced twice in 2025 — the FMS was amended and re-submitted to record the change.

RHI0000024378

Park Farm

Liquid food waste, wash water and Argent glycerol. Certain glycerol suppliers are treated as ineligible and drive an eligible heat output deduction.

RHI0000024335

Bubwith (R100)

Liquid food waste, wash water and Argent glycerol. Glycerol needs a %MONG calculation on a weighted-average basis to establish fossil contamination.