Simulation

Site scenarios

Each scenario starts with a message from site and puts you through the decisions that pack would demand. Every step is marked. Sign in first if you want the result saved to your record as proof of competency.

Hemswell Biomethane · RHI0000024078

First accreditation pack

A food-waste fed AD plant injecting biomethane to grid, with propane enrichment. Six waste consignments, all unmixed before the digester.

Start

Barnes Farm · RHI0000024090

Tanker deliveries and digester heat

Liquid food waste and wash water delivered by road tanker, plus digestate. Heat meters on the digesters are declared in Section I.

Start

Local Generation Biomethane · RHI0000024245

Mid-quarter meter replacement

Food-waste AD plant whose fiscal flow meter was replaced twice in 2025 — the FMS was amended and re-submitted to record the change.

Start

Park Farm · RHI0000024378

Heat deduction and enrichment

Liquid food waste, wash water and Argent glycerol. Certain glycerol suppliers are treated as ineligible and drive an eligible heat output deduction.

Start

Bubwith (R100) · RHI0000024335

Glycerol in the mix

Liquid food waste, wash water and Argent glycerol. Glycerol needs a %MONG calculation on a weighted-average basis to establish fossil contamination.

Start

Ready to be assessed?

The competency quiz draws 30 questions across every section, marked at an 80% pass mark.

Take the quiz